DOC-1018DICOM headerChapter COP
Needs review

egress_inspection_v3.dcm

Owner: Dr. Priya Sharma
Uploaded: 19 Aug 2026
Version: v2
Size: 127.5 MB
0%Quality
Document Gaps Summary:1 Gaps FoundCritical: 1Major: 0Minor: 0

Quality Assessment

This document is missing an explicit revision cadence or committee approval stamp, which a surveyor will typically ask for.

Classification:egress inspection
Effective year:2025
Review due:Q4 2026

What this document proves

Measurable element alignments and explainability trace

COP.2Critical Gap (GAP-1018)

Care of patients — control 2: documented process, responsible owner and evidence of practice (paraphrased)

COP.2
egress_inspection_v3.dcm
Documented Policy Evidence
Verification Gap Detected
COP.3Verified · Requirement Met

Care of patients — control 3: documented process, responsible owner and evidence of practice (paraphrased)

COP.3
egress_inspection_v3.dcm
Documented Policy Evidence
High Confidence (88%)
COP.4Verified · Requirement Met

Care of patients — control 4: documented process, responsible owner and evidence of practice (paraphrased)

COP.4
egress_inspection_v3.dcm
Documented Policy Evidence
High Confidence (88%)

Open findings related to this document (1)

critical
GAP-1018
Open

Documentation gap in egress_inspection_v3.dcm: Policy requires verified committee endorsement and alignment with JCI COP Measurable Elements.

Target requirement: COP.2

Machine-generated observation. Every item requires human review and sign-off before it is acted on.