DOC-1028DOCXChapter PFR
Accepted

egress_inspection_v3.docx

Owner: Dr. Elena Rostova
Uploaded: 19 Jul 2026
Version: v2
Size: 703.2 MB
0%Quality
Document Gaps Summary:1 Gaps FoundCritical: 0Major: 0Minor: 1

Quality Assessment

This document satisfies the core requirement baseline but would benefit from a refreshed review signature before survey.

Classification:egress inspection
Effective year:2025
Review due:Q2 2027

What this document proves

Measurable element alignments and explainability trace

PFR.2Major Gap (GAP-1028)

Patient and family rights — control 2: documented process, responsible owner and evidence of practice (paraphrased)

PFR.2
egress_inspection_v3.docx
Documented Policy Evidence
Verification Gap Detected

Open findings related to this document (1)

medium
GAP-1028
Open

Documentation gap in egress_inspection_v3.docx: Policy requires verified committee endorsement and alignment with JCI PFR Measurable Elements.

Target requirement: PFR.2

Machine-generated observation. Every item requires human review and sign-off before it is acted on.